Exterior

Waterfront Property

May 29, 2013

We had our first real, hard rain in almost 2 years.  When we get almost an inch of rain in 10 or 15 minutes, the water runoff from all the houses up the hill engulf our yard as it washes down the hill. In the below picture, there is a 12″ x12″ drain to the [...]

North Siding Work Completed!!!

September 18, 2012

If you’ve seen my previous project pictures, I’m excited to show you the (almost) finished product: I still have a few minor things to wrap up before its totally complete, but its close enough to show off.  I’ve installed: 6 Windows (Andersen 100 series) siding boards (4′ x 9′ sheets) batten trim (1.5″ PVC trim) [...]

North Siding Progress

July 16, 2012

I figured, I should post an update about how the siding is going. Here is a couple before pictures: Below, I show new siding on the right vs. old rotten siding on the left. Below, I’ve removed much of the siding and I’ve replaced 5 windows, with the help of 5 of my friends. And [...]